SolutionsCompliance and deadlines
A lapsed certificate is not admin.
It is an increase you cannot send.
Dardaris is an AI property manager for landlords. EPC, electrical, boiler, chimney, insurance, lease registration. Each date on one calendar, marked valid, expiring or expired from its own date. Where a property’s rules confirm a requirement it says so, and where they could not be confirmed it says that instead.
Dardaris is early and still moving. No reply or rent letter goes out in your name until you approve it.
Certificates and statutory dates
3 buildings
3 to act on of 6 tracked
- Boiler service, gasDokkaai 12, 1F26 SepExpiring
- Lease registrationZandstraat 43 OctDue
- Chimney sweepZandstraat 48 NovExpiring
- Landlord insuranceKortrijksesteenweg 881 JanValid
- EPCZandstraat 412 MarValid
- Electrical conformityKortrijksesteenweg 8819 JunValid
Where a property’s rules tie indexation to its energy rating, an expired EPC can stop you raising the rent. A certificate shows as expiring for the last 90 days before it runs out.
What today costs
Miss a date here and the consequence is legal.
Late rent is money that arrives later. A lapsed certificate is a rent increase you are not allowed to ask for, a letting you may not be allowed to continue, and a tenant who can leave without notice.
The certificate that lapsed in a drawer
An EPC runs ten years. It expires once per owner per decade, on a date written inside a document nobody has opened since the day it was filed.
The increase that cannot be sent
In Brussels an expired energy certificate blocks indexation outright. Not reduced, blocked, until a surveyor has been out and issued a new one.
The lease registered two days late
Belgium gives the landlord two months from signature. The fine is small. The real sanction is that a tenant on a nine-year lease can then walk out with no notice and no indemnity.
How it works
It reads the date on the certificate.
A flag on the day a certificate expires reports a failure. So each certificate is marked expiring for its last 90 days, which leaves time to arrange a visit.
- Step 1
The rule pack says what applies
Which certificates your region requires, how long each stays valid, and which of them this building actually needs. Six packs ship with it, and Belgium is three of them.
- Step 2
Each one is read against its own date
Every time the page opens, each certificate is compared with its expiry date and marked valid, expiring or expired. Expiring means 90 days or fewer remain, the same for every certificate.
- Step 3
A renewal task goes on your list
When a certificate is expiring, a task to arrange the renewal is added to your list. Nothing is booked and nothing is sent: you choose who comes and when.
- Step 4
The new document is filed
Against the unit or the building it covers, with its issue and expiry dates, and the next date follows from there. No second calendar to keep in step.
One certificate, from issue to replacement
An EPC is issued once and then does nothing for ten years, which is exactly why it lapses. Issued 12 March 2016, valid to 12 March 2026. The work sits in the last three months, so the last twelve are drawn below.
12 Mar 2025
12 Mar 2026, expiry
- Valid, nothing due
- Expiring, last 90 days
- Replaced, valid again
- 12 Mar 2016Issued, and filedAttached to Zandstraat 4, with its issue and expiry dates.Filed
- to Dec 2025Nothing dueNine years and nine months in which the only correct action is none.Quiet
- 12 Dec 2025Marked expiring, and a task is addedThe last 90 days. A task to arrange the renewal goes on your list.Dardaris
- 12 Jan 2026You arrange the surveyorYou choose the surveyor and the day. Nothing is booked for you and nobody is asked for a quote.Your call
- 3 Feb 2026The new certificate is filedAttached to the unit with its dates, and valid to February 2036.Filed
A lapsed EPC is not only a compliance problem. It stops you raising the rent. In Brussels an expired energy certificate blocks indexation outright, and it has to be valid at the moment you index rather than merely when the lease was signed. The anniversary passes, the increase does not happen, and no letter afterwards recovers it. How indexation works
What you get
One calendar, six rule packs, and the paperwork where the asset is.
Every certificate on its own date
An EPC runs ten years, an electrical inspection twenty-five, a boiler and a chimney one. Each is read against its own expiry date, and each shows as expiring in the last 90 days.
How long each one is valid
Flagged from
- Electrical conformityValid 25 years90 d
- EPCValid 10 years90 d
- Boiler service, gasAnnual, oil roughly 3-yearly90 d
- Chimney sweepAnnual90 d
- Landlord insuranceRenewed annually90 d
How long a certificate stays valid comes from the property’s rule pack. The window before it runs out is the same 90 days for all of them.
Lease registration, tracked to the day
Where the rules for a property confirm it, a lease has to be registered. In Belgium that is two months from signature, filed by the landlord. Dardaris counts the days from the signature date on the lease.
Lease registration, Zandstraat 4
day 46 of 60
The date is counted from the signature and shown on the calendar and on the lease. It leaves both once the lease is registered.
A pack per region, not per country
Flanders, Brussels, Wallonia, the Netherlands, France, and a placeholder for anywhere else. Belgium is three because the regions have diverged since 2018, and the pack follows the building, so a Ghent owner with a Brussels flat gets Brussels rules.
Filed where the asset is
The boiler attestation belongs to the unit, the lift inspection to the building. Open either and its documents are there, dated, rather than in a folder named after the year they arrived.
Anything unconfirmed says so
Every rule in a pack is either sourced or flagged. Dardaris shows you what it could not confirm against a primary source and how many such rules a pack still holds, because a guess dressed as settled law is worse than a blank.
Flanders, certificates required to let
The EPC and the electrical report are sourced. Whether an asbestos attest is yet required to let a dwelling is not, so it is flagged rather than acted on.
Where it stops
It tracks and reminds. It does not book, file or advise.
Dardaris is not your lawyer, and it certifies nothing itself.
It watches the date and puts a task on your list. The certificate is signed by the surveyor, the technician or the registry, never by us. Where a rule could not be confirmed against a primary source it carries a flag, and it shows as something to check rather than something required.
Waits for you, every time
- Booking a tradesperson or asking for a quote
- Anything resting on a rule still marked confirm this
- Submitting a registration or a filing in your name
- Deciding that a certificate does not apply to a building
Everything it prepares comes with the reason behind it.
Start
Running by tomorrow morning
- 1
Add your homes, or import them. Each address picks the rules it follows, with anything unconfirmed marked to check.
- 2
Connect the account the rent lands in. Payments match themselves.
- 3
Read tomorrow's briefing: what was done, and what needs you.
No need to move everything first. Cancel whenever, with a full export.
Hand over this part first.
Bring one building and watch it work through the free trial. Move the rest across only if the trial convinced you.
Nothing to move first · No reply sent without your approval
The rest of the job